While students are away for the summer, maintenance of our facilities heats up. This past week we performed maintenance and repairs on our parking lots. At CHS, sections in poor condition were repaved and the entire parking lot was sealed and line striped. The front parking lot at MED was also sealed and line striped, and at the bus lot pavement around the storm drains was repaired.